DDbDP transcription: p.petr.kleon.124 [xml]
[Reprinted from: p.petr.3.46_3] P.Petr. 3 46_3
[1 line missing]
3πλίνθου τῆς καταχρησθείσης εἰς τοὺς
οἰκοδομηθέντας τοίχους Β τιμὴ ὡς τῆς μ(υριάδος) π ιϛ
5οἰκοδόμοις καὶ λειτουροῖς η
ὠλενῶν δορωσίμων (πήχεις) σο (ἀνὰ) (ἡμιωβέλιον) (τέταρτον ὀβολοῦ) λγ (ὀβολοὶ) δ (ἡμιωβέλιον)
δο̣ρώσεως τ̣ῶν ρ πηχῶν δ ια
(γίνονται) ξ\η/ (τετρώβολον) (ἡμιωβέλιον)
εἰς τὴν πρὸς τῶι χορτοβόλωι ἀσυντέλεστον [ ̣ ̣ ̣ ̣ ̣ ̣ ̣] ̣ Β
10τοῖς τὸ θεμέλιον ὀρύξασ̣ι̣ καὶ τὸν ἀπὸ τῆς οἰκοδ̣ομ̣ῆ̣ς̣ χο̣ῦν
πλίνθου τῆς καταχρ(ησθείσης) εἰς το\ὺ̣ς̣/(*) ἐπαρθέντα\ς/(*) τοίχους(*)
⟦ ̣ ̣ ἐ̣γ̣ δ̣ομῶν ι Ϛ τιμὴ⟧ Θϡξ
τιμὴ τῆς μ(υριάδος) π οθ (τετρώβολον) ⟦ ̣ ̣ (τετρώβολον)⟧
Editorial History; All History; (detailed)
© Duke Databank of Documentary Papyri. This work is licensed under a Creative Commons Attribution 3.0 License.
HGV 7459 Translation (English) [xml]
1 For the buildings [...]
3 for 2000 bricks used for the walls which have been built, at the rate of 80 dr. for
10,000 bricks: 16 dr.
5 to builders and their assistants: 8 dr.
6 for mats used in plastering, 270 cubits at 3/4 ob.: 33 dr. 4 1/2 ob.
7 for plastering at 4 dr. for 100 cubits: 11 dr.
8 total: 68 dr. 4 1/2 ob.
9 for the unfinished building (?) near the hay-loft: 2000 bricks (?)
10 for those who dug the foundation and - - -
11 for bricks used for the walls raised in height: 9960 bricks
12 at a price for 10,000 bricks at 80 (dr.): 79 dr. 4 ob. (Translation with slight modifications: B. Van Beek in P.Petr.Kleon, p. 252, © Peeters)